Construction & Building Machinery

Aggreko launches Canadian Tier 4 Final generators from 145 kW to 1,200 kW

The Canadian-only lineup pairs CSA and UN31A compliance with a 1,200 kW model that delivers 600 V without a step-up transformer.

Nadia VargaNovember 4, 20265 min read1 views
Concept illustration of a large enclosed generator and two smaller canopy units on a remote Canadian worksite under cold, overcast light.

Aggreko has introduced three Tier 4 Final diesel generators configured for remote Canadian worksites, with capacities of 145 kW, 210 kW and 1,200 kW at 600 V. The models are offered exclusively to Canadian contractors and are intended to meet local market and regulatory requirements, the company says.

The 145 kW and 210 kW sets are canopy units designed for immediate deployment, while the 1,200 kW unit is positioned for large industrial loads. According to Aggreko, all three models are CSA and UN31A compliant, covering Canadian electrical and fuel regulations.

Direct 600 V output

Aggreko says the 1,200 kW model's onboard 600 V capability removes the need for separate step-up transformers. The company argues that direct 600 V output can reduce project complexity, improve cost-efficiency and lower the number of potential failure points. That configuration is particularly relevant for large industrial loads where 600 V is frequently required, Aggreko says.

The launch extends Aggreko's Canadian fleet, which ranges from 25 kW to 1,200 kW. The smaller canopy units are positioned for immediate energy needs, while the largest model is intended for heavy industrial applications. Through its Canadian service-centre network, Aggreko says its energy specialists will work with customers in data centres, construction, oil and gas, mining and events to deploy temporary power for a range of applications.

Remote operations and data centres

Aggreko describes the generators as suited to remote territories where large petrochemical and mining operations need power, as well as to construction and data-centre projects. Paul Nascimento, managing director for Canada at Aggreko, said the models pair the company's latest generator technology with hardware tailored to Canadian operating requirements. He said Canada's large petrochemical and mining industries need power across vast and remote territories, alongside thriving construction and data-centre sectors, creating demand for engineered energy solutions that are both powerful and precisely configured.

Aggreko claims the three models provide industry-leading fuel efficiency, ultra-low emissions and controlled noise levels that surpass local requirements. The company also points to Canada's expanding data-centre industry, where provincial regulators are looking to limit how much power data-centre operators draw from the grid. In that context, Aggreko says Tier 4 Final generators can provide off-grid energy to keep data centres operational while minimizing disruption to communities. These are company claims about suitability and performance, not independently verified results.

Aggreko says the new models are available exclusively to Canadian contractors. The company's broader Canadian range and service network are intended to support temporary power across commercial and industrial applications.